• CHANGZHOU HAICHEN PACKING MATERIAL CO.,LTD
    daniel
    thanks for providing us a professional underlay
  • CHANGZHOU HAICHEN PACKING MATERIAL CO.,LTD
    david
    nice underlay , not easy to tear out
Contact Person : summer
Phone Number : 86-15961250063

30m2 2mm Black Preformatted EVA Foam With Silver Aluminum Foil Underpad

Place of Origin CHINA
Brand Name HC
Certification SGS
Model Number EVA20-AF-Hole
Minimum Order Quantity 3000m2
Price USD0.2-0.8/M2
Packaging Details 15m2, 20m2, 30 m2
Delivery Time 10-15 days
Payment Terms T/T
Supply Ability 2 containers per day

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Material EVA Foam Thickness 2mm
Width 1.1m Length 27.27m
Roll Size 30 M2 Density 110kg/m3
High Light

Black Preformatted EVA Foam

,

EVA Foam Aluminum Foil Underpad

,

Silver Aluminum Foil Underpad

Leave a Message
Product Description
30m2 2mm Black Preformated EVA Foam With Silver Aluminum Foil Underpad
 
 
Thickness
2mm&3mm
 
Size
100sf/roll or 200sf/roll and so on
 
Colour
wood
 
Logo
Customized Logo
 
Film
PE film, Aluminum film , Gold film , selt-adhesive tap added as request
 
Usage
used for underlayment for engineerd hardwood flooring,
laminate floor,bamboo floor,etc;packing materials, protective materials etc.
 
Payment
30% deposite and 70% upon the copy of B/L
 
Delivery Time
Within 15days after receipt of your deposite
 
Advantage
non-toxicity,eco-friendly,tasteless,very low radiation
 
Luxury underfoot comfort
 
Impact resistant, Fire-retardant, Noise reduction, Antistatic
 
Antibacterial ,for healthful environment
 
Unaffected by moisture
 
Extends the life of your carpet/floor
 
low-cost and prompt dilivery
 
Completely recyclable
 
IIC and STC test report

 

 

 

 

 

After-sales service system:

1.the quality problem: we check every product carefully before the delivery, and provide 2 years
warranty time, if you find problems please contact us in time

2.the quantity problem: when receiving goods please check quantity, if you find quantity is error, please contact us in time, we help you reissue after verification

3.other problems: about the product performance and safety knowledge, you also can consult our engineers.

 

Installment

1. Ensuring the concrete was clean and dry.


2. Having the tape of underlayment aligned in the corner of wall,scrolling laying the underlayment.(Moisture film contact with concrete).


3. Repeating the step 2,sealing with transparent tape until the whole room was completed laid.


4. Floor laying in accordance with the requirements.

 

 

 

30m2 2mm Black Preformatted EVA Foam With Silver Aluminum Foil Underpad 0